
 | TREATMENT | |
- 2 SEUM steam generators
Fama Harrington grids, spreader-stockers,
80 tons of steam/hour, 64 bars, 455°C - 1 SEUM steam generator
Fama-Harrington grids, spreader-stockers,
110 tons of steam/hour, 12 bars
|

|
FOREST steam soot removers originally installed but later dismantled. Only the economizers were steam swept, once a week, and only after 1984.
SP Nitro Nobel power preventive treatment set from 1969, suggested by Charbonnages de France, replaced in 1988 by liquid process GEPERSUIE C.F.(DRIVEX 2100).
- 1 SEUM steam generator
Fama Harrington grids, spreader stockers
110 tons of steam/hour, 64 bars, 455°C
|

|
Preventive treatment SP Nitro Nobel (powder) set from the boiler's construction date in agreement with boiler-maker SEUM, later replaced with liquid product GEPERSUIE C.F.(DRIVEX 2100).
Originally built without steam soot-removal system either in the super heater or in the convecting cluster. The sole economizer was steam-swept once every other day.
|
|
 |
 |
|